- 10 Residential units
- 1 Unit for sale
- Completion expected December 2025
Equipment and special features of this development project
New building under construction, delivery approximately Q1 2026. It is a project of 10 very bright apartments, very close to Hospital Sant Pau (Recinto Modernista Sant Pau). Corner building with lots of light and large windows. Building of different typologies, 2 and 3 bedroom apartments, all with terrace. There are 7 units left for sale: Pb-1º+ ALTILLO 625.000€ + vat (3H+2B). Pb-2º+ ALTILLO 530.000€ + vat (2H+2B) Apartment 2-1º 525.000€ + vat (3H+2B) Apartment 3-1st 585.000€ + vat (2H+1B) 3rd-2nd floor 585.000€ + vat (2H+2B) 4th-1st floor 630.000€ + vat (3H+2B) Apartment 4-2º 600.000€ + vat (2H+2B) Communal rooftop terrace with Jacuzzi, relaxation area. Excellent finishes-furniture, equipment, complements. The kitchen will be equipped with extractor hood, gas hob, electric oven and appliances (microwave). Worktop of artificial stone Silestone type or similar of 20 mm thick. The kitchen and bathroom furniture will be made of 20 mm thick panels with metal handles and drawers in bathrooms. Interior carpentry type Norma, lacquered in white. The leaf will be standardized, 203 cm high, with smooth faces and 35 mm thick, with internal cardboard structure including hanging and closing mechanisms, brass-plated hinges, handles, chains and knobs. Flanders wood pre-frame lined with good quality veneered wood, forming rebate and flashings. All flashings shall be of 7 cm rectangular section. The sliding doors will also be white lacquered in standard sizes, they will be embedded in the partition wall by means of a corrugated sheet metal casing with built-in guide. The entrance door to the house will be armored Norma type, white lacquered, with smooth faces and 45 mm thick, including brass hinges, interior handle, knob, security lock and optical sight.