- 1 Residential unit
- 1 Unit for sale
- Completion expected February 2024
Equipment and special features of this development project
This country house is located in a quiet area with easy access to both the town and the highway. The land of about 70,000 m² with wooded area, offers total tranquility and privacy. Construction is scheduled to start in September 2022 and is expected to be completed by the beginning of 2024. The house, of approx. 330 m² distributed over two floors, will have four bedrooms with four en-suite bathrooms, as well as a guest toilet. In addition, it will have a pool of approx. 45 m². Throughout the construction, high quality materials will be used and a traditional and rustic style will be combined with an avant-garde style. Additional features: heating, air-conditioning, double-glazed windows and much more.