Glyfada Heights: 3rd Floor Penthouse
- 3 Schlafzimmer
- 4 Badezimmer
- 163 m² Gesamtfläche
- 163 m² Wohnfläche
Beschreibung
Apartment maisonette 2nd and 3rd floor apartment of total surface of 164 sq.m. awaits its new owner. On the 2nd floor (96sqm) there is a living room, dining room and open kitchen, guest toilet and a bedroom with bathroom. On the 4th floor (67.61sqm) there are 2 more bedrooms both with on suite bathrooms, plus an area that can be used as an office and leads to a beautiful terrace with its own private pool. There are two underground parking spaces as well as a storage room. All apartments will have an air conditioning system that will cover the All the apartments will be equipped with an A/C system that will cover the needs of the properties in both the winter and summer season. air-water system and will provide each apartment with full autonomy. The cooling will be achieved by a heat pump system autonomous and independent for each apartment through local air conditioning units - fan coil units (F.C.U.), which provide the owner of each apartment with the autonomous desired temperature in each room individually. In all the apartments for heating all the rooms of the apartments will be built underfloor heating system of the company REHAU, according to the engineering study. The water for heating the rooms will be supplied by the building's heating system. produced by an autonomous and independent heat pump for each apartment. All apartments will have an energy fireplace. NETMETERING system will be installed which is a method of power generation from photovoltaic panels. Based on this, the owner can through the autonomous photovoltaic panels to offset a percentage of the electricity that his property needs. The combination of a photovoltaic system with a current heat pump to be installed has the potential to significantly reduce or even eliminate the heating - air conditioning costs of each property. This possibility in combination with other engineering studies classify the building and each property independently in energy class A++. * The Energy Performance Certificate is in the process of being issued. ** Construction will be completed in the 4th quarter of 2025.